Yes. I tried it for both facilities and it told me "No records found
starting at entered search argument". I'm thinking that I don't have an
order policy code or something else in the CIC file set up correctly.
Dave Parnin
Nishikawa Standard Company
Topeka, IN 46571
daparnin@xxxxxxxxxxxxxxxxxx
Daniel Warthold <daniel.warthold@xxxxxxxxx>
Sent by: To:
"SSA's BPCS ERP System"
bpcs-l-bounces+daparnin=cooperstandard.com@m
<bpcs-l@xxxxxxxxxxxx>@SMTP@CTB
idrange.com cc:
(bcc: David A Parnin/Topeka/NISCO/SPCO)
Subject: RE: [BPCS-L] DRP for Dummies
03/07/2005 01:35 PM
Please respond to "SSA's BPCS ERP System"
<bpcs-l@xxxxxxxxxxxx>
Did you run DRP500D DRP generation? and then DRP540d1 release planned
orders?
> Daniel Warthold P. eng CPIM
Business Analyst
> Eicon Networks Corporation
>
>
-----Original Message-----
From: daparnin@xxxxxxxxxxxxxxxxxx [mailto:daparnin@xxxxxxxxxxxxxxxxxx]
Sent: Monday, March 07, 2005 12:30
To: bpcs-l@xxxxxxxxxxxx
Subject: [BPCS-L] DRP for Dummies
I'm the dummy in this case because I've been trying to get DRP to work and
haven't been getting what I'm expecting. I'm new to DRP and long ago I
knew MRP/MPS. I want to set up DRP in our test database before we try it
in our live environment. We do have DRP set up from facility 01 to
facilities 02 and 03. It was set up by people who no longer work here and
now I need to get a better understanding of DRP so we can set up a similar
configuration from facility 02 to facility 03 (02 builds FG and 03 builds
component).
I have set up created a shop order for the 02 item (B100). In MRP300 the
requirements for the 03 item (N100) appear under facility 02. I was
expecting them to appear under 03 as a planned order which I firm up and
create an 03 shop order from. In DRP100 I have created a record for N100,
To Fac=02, From Fac=03. How should I set CIC records up in DRP140?
We are at version 4.0.2 and do not use customer orders or billing in BPCS.
Those come in from Future3 as forecasts and ultimately get shipped there.
We do use BPCS MPS/MRP/DRP and shop orders. Thanks.
Dave Parnin
Nishikawa Standard Company
Topeka, IN 46571
daparnin@xxxxxxxxxxxxxxxxxx
MRP300-02 Planning/Pegging Inquiry 3/07/05
12:26:00
Item N100 + Test sub-asmb for New Haven On Hand
.000
Facility 02 + Class 47 Lead Time 0 0 U/M EA Alloc Mfg
102.000
Order Policy Lot Size 1.000 Alloc Cus
.000
MRP Code Activity Y Incr Lot .000 On Order
.000
JIT Code Horizon Date 1/01/05 Min Bal .000 Non Net
.000
Method 1 Rel Consume Forecasts Batch 1.000 Stocking U/M
Method 2 Rel Consume Forecasts Demand Fence Date 1/08/05 Yield
100.00
Type WIP EXTRUSIO
--------------Orders-------------- -------Requirements-----
Action Ref# Quantity Rel Due Fr Wh Ref# Quantity Need
Balance
M420960 102 20105
102-
--
This is the SSA's BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.
Delivered-To: daniel.warthold@xxxxxxxxx
--
This is the SSA's BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.
Delivered-To: daparnin@xxxxxxxxxxxxxxxxxx
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2025 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.