Dick,

We are running a 6.0.0 version of BPCS.

Check and TEST the J - Multiple Issue Transaction from the Inventory
Transactions screen.

I believe it will allow you to generate a reverse of the CI's by
allowing you to enter the Production Quantity in a negative quantity for
a shop Order which then generate a reversal of the CI's for all on the
shop order material list.
You would still have to enter a reversal of the PR if that is also
required since it only addresses the components.

The gotcha on this one is that the transaction will generate a Mass
Component entry list for the CI's for all components. The potential
problem with this is that the location defaults to a location you must
enter in the initial screen. If you use a single location for all CI's
then you may have no problem. The Mass Component Entry list may allow
you to override the default issue location.

I cannot stress enough that you should test this thoroughly before
attempting to execute it for all of your transactions!

Good luck,



McK King
Bway

-----Original Message-----
From: bpcs-l-bounces@xxxxxxxxxxxx [mailto:bpcs-l-bounces@xxxxxxxxxxxx]
On Behalf Of Kevin G. Harper
Sent: Wednesday, January 26, 2011 8:27 AM
To: BPCS ERP System
Subject: Re: [BPCS-L] Shop Order Material Reversal

Dick,

Normally this can be done through SFC650.
You can back the partially finished items through each step and it will
post
the corresponding negative CI's to return the material issued. Just
enter a
labor ticket for each operation, make the "Qty Good" negative (1-), and
post.
A completed operation will generate a warning but will not stop you from
proceeding.
A few things to watch out for, like each component's lot status
remaining
active. But you should see warning/error messages for any such
conditions.


Kevin Harper






We are on 8.3.

We created a shop order for assembly of a machine, with 5 reporting
steps.
After completing 3 steps, we realized that the BOM was wrong, and we
need
to reverse the CI transactions already entered. There are about 500 of
these
CI transactions.

How do we enter negative quantities for each of the "completed"
operations
in reversing them in such a way that it generates reverse CI
transactions?
Some times in the past this has worked for us, but it doesn't this
time.

What's the trick to making it work?

Dick Bailey
MCFA, Inc.


--
This is the BPCS ERP System (BPCS-L) mailing list
To post a message email: BPCS-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/bpcs-l
or email: BPCS-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/bpcs-l.




As an Amazon Associate we earn from qualifying purchases.

This thread ...

Replies:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.