That's why I suggested he contact Pete O.....   But I would think it would
just be a SMOP for Pete to tweak the code for them - the hard stuff is
pretty well handled.  TBC handing isn't rough.  The rest just needs thought
out and defined (and the rules followed - which can be a challenge).
I will say that the project was VERY successful for us, and since we
started using it, the factory departments are able to hit their due dates
without killing themselves (as long as the materials are here!).   And this
was a VERY successful basis for us to build on for other projects, still
on-going.
Dale Gindlesperger
IT Manager/Special Projects Leader
Fleetwood Folding Trailers, Inc.
258 Beacon Street
Somerset, PA  15501
                                                                           
             "Jeff Snyder"                                                 
             <jeffreygsnyder@h                                             
             otmail.com>                                                To 
             Sent by:                  mapics-l@xxxxxxxxxxxx               
             mapics-l-bounces@                                          cc 
             midrange.com                                                  
                                                                   Subject 
                                       Re: [MAPICS-L] Calculate Cumulative 
             08/13/2007 09:39          Lead time (w/EPDM)                  
             AM                                                            
                                                                           
                                                                           
             Please respond to                                             
             MAPICS ERP System                                             
                Discussion                                                 
             <mapics-l@midrang                                             
                  e.com>                                                   
                                                                           
                                                                           
   Dale,  Antonio   (Pete O)
   This custom code was written with some FFT asumptions in mind.....
   defaults for TBC.  we do not handle TBC of 'H' per Lot and I believe we
   assume Labor time,  not machine hrs  (ie , we do not check the W/C Prime
   load code)  and finally,  we assume labor time in Hrs / pc Not minutes,
   and Not pcs / hr....
   Just a few cautions.....You'd have to consider base code and make
   appropriate changes....
   Jeff Snyder
   also with Guide Technologies....
     ----------------------------------------------------------------------
     From:  DaleGindlesperger@xxxxxxxxxxx
     Reply-To:  MAPICS ERP System Discussion <mapics-l@xxxxxxxxxxxx>
     To:  MAPICS ERP System Discussion <mapics-l@xxxxxxxxxxxx>
     Subject:  Re: [MAPICS-L] Calculate Cumulative Lead time (w/EPDM)
     Date:  Fri, 10 Aug 2007 15:24:00 -0400
     We have one that was developed for us by Pete Olshavsky at Guide
     Technologies.   Works great!    Pete is on this thread, perhaps he can
     contact you directly.   I (obviously) have no problem with sharing
what
     he
     developed for us.
     Dale Gindlesperger
     IT Manager/Special Projects Leader
     Fleetwood Folding Trailers, Inc.
     258 Beacon Street
     Somerset, PA  15501
                   ARojas@senioraero
                   space.com
                   Sent by:
     To
                   mapics-l-bounces@         mapics-l@xxxxxxxxxxxx
                   midrange.com
     cc
Subject
                   08/10/2007 01:52          [MAPICS-L] Calculate
Cumulative
                   PM                        Lead time  (w/EPDM)
                   Please respond to
                   MAPICS ERP System
                      Discussion
                   <mapics-l@midrang
                        e.com>
     Need help... please.....
     Does anybody have a program to calculate the: Cumulative Lead Time ?
     (with EPDM)
     Thank you,
     Antonio Rojas
     I.T. Manager
     Senior Aerospace - SSP
     Ph: (818) 260-2218
     _______________________________________________
     This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
     To post a message email: MAPICS-L@xxxxxxxxxxxx
     To subscribe, unsubscribe, or change list options,
     visit: 
http://lists.midrange.com/mailman/listinfo/mapics-l
     or email: MAPICS-L-request@xxxxxxxxxxxx
     Before posting, please take a moment to review the archives
     at 
http://archive.midrange.com/mapics-l.
     _______________________________________________
     This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
     To post a message email: MAPICS-L@xxxxxxxxxxxx
     To subscribe, unsubscribe, or change list options,
     visit: 
http://lists.midrange.com/mailman/listinfo/mapics-l
     or email: MAPICS-L-request@xxxxxxxxxxxx
     Before posting, please take a moment to review the archives
     at 
http://archive.midrange.com/mapics-l.
     ----------------------------------------------------------------------
   Puzzles, trivia teasers, word scrambles and more. Play for your chance
to
   win!
 
As an Amazon Associate we earn from qualifying purchases.