|
We'll soon be ordering a 600 model AS/400 which will hopefully be here by
Christmas. We have specified that we want to do a side by side conversion
so that there will be enough time to iron things out.
Here are my questions:
1) having never done a conversion, how difficult is it to do? I have
heard many times to always follow the roadmap exactly as written.
2) if I do it, what support is available if we run into problems?
3) will it be safer to pay someone else to do it? Is anyone available
around Christmas?
4) what documentation should I be getting now? I have ordered the
PTF which analyzes the system for conversion. It will be installed
this weekend. We are currently at V3R2 on a model 300.
5) is there anything else I need to know.
By the way, thanks to everyone for their help and responses to the list.
I'm sure that there are a great many people, such as I, that gain a lot of
good information from this list.
Thanks in advance for responding,
Marc Zylka (mzylka@netpath.net)
Flynt Fabrics, Graham, NC.
+---
| This is the Midrange System Mailing List!
| To submit a new message, send your mail to "MIDRANGE-L@midrange.com".
| To unsubscribe from this list send email to MIDRANGE-L-UNSUB@midrange.com.
| Questions should be directed to the list owner/operator: david@midrange.com
+---
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2025 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.