|
From: Alexei Pytel <pytel@us.ibm.com>
> It might happen because of dynamic priority scheduler.
The DYNSCD is now turned off. I have three jobs looping (ALOOP).
Every second they show a screen (with no wait) and YIELD their timeslice.
Job 0007 is trying to save an object to a save file that already exists,
and I had to type "G" to tell it to Go ahead. After that, the save is stuck
in an EVTW. Job 0001 is sitting on a DSPW. I can interact with that
screen with no wait at all. (This is on V4R5).
QBASE QSYS SBS .0 DEQW
DSP02 LSVALGAARD INT 1.1 CMD-WRKACTJOB RUN
QPADEV0001 LSVALGAARD INT .0 CMD-LSEXPLR DSPW
QPADEV0002 LSVALGAARD INT 7.2 PGM-ALOOP RUN
QPADEV0003 LSVALGAARD INT 8.6 PGM-ALOOP RUN
QPADEV0005 LSVALGAARD INT 7.3 PGM-ALOOP RUN
QPADEV0007 LSVALGAARD INT .0 CMD-SAVOBJ EVTW
QSYSSCD QPGMR BCH .0 PGM-QEZSCNEP EVTW
If I "hold" jobs 0002, 0003, and 0005, the save finishes. But why was the
job stuck on the EVTW?
This mailing list archive is Copyright 1997-2026 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.