|
Somewhat related to my last post on SPCN... I noticed that my QUPSDLYTIM system value is set to *CALC. How does the AS/400 know how much juice is left to be able to determine whether it needs to start shutting down? Is there another cable that allows the UPS and AS/400 to communicate this information? I don't think our UPS's have that, or if they do, they were never set up to do this. If a comm cable is required, then what is the effect of the *CALC setting? Background for all this: Last night, one of our branches cut power to the building to install a new A/C unit (unbeknownst to us), relying on the UPS to keep all of the computer equipment up for the "short" time that the electricity was going to kept off. I was told by the branch manager that the AS/400 lost power immediately after the building power was turned off. While the building power was off, we powered the AS/400 back up, so this is how I know that the AS/400 was attached to the UPS. The IPL was proceeding when the UPS got completely drained 15 minutes later and then all equipment on the UPS went down. Main power was restored shortly thereafter, the AS/400 IPL'd normally (!), got a signon screen within 20 minutes (a normal IPL for this box), nothing "damaged" as far as I could tell. Lessons learned: Don't power the AS/400 back up until after main power was restored. WHAT THE @#%* WAS I THINKING? Dan Bale IT - AS/400 Handleman Company 248-362-4400 Ext. 4952 D.Bale@Handleman.com
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.