|
And there's always manual mode, move to function 08, press the enter button. Severe nastyness will result on next IPL (if it even comes up!) jch -----Original Message----- From: Walden H. Leverich [mailto:WaldenL@TechSoftInc.com] Sent: Wednesday, September 11, 2002 8:39 AM To: 'midrange-l@midrange.com' Subject: RE: How do I end a job that is ending? The + sign indicates the presence of group jobs, try F14. As for ending a job, I assume you did an ENDJOB *CNTRLD, and then an ENDJOB *IMMED on it, no? If the *IMMED doesn't work you can try ENDJOBABN (End Job Abnormal) HOWEVER that results in the next IPL (when ever that may be) being an abnormal IPL, so use with caution. I'd try and "trick" the job into ending first. You say the job is set to *WRAP the joblog. Try changing it to *NOWRAP, let it fill the joblog and then it should end on it's own. Or try deleting a program that it's calling so it crashes. Or lock a record it needs so it hangs up on a lock wait. If there are group jobs you should end them too, but the endjob *immed should have worked to bring everything down. -Walden PS. PWRDWNSYS *IMMED should also do the trick! And as a last resort there's always that cable between the iSeries and the UPS (and I don't mean the communication cable!) <G> ------------ Walden H Leverich III President Tech Software (516) 627-3800 x11 (208) 692-3308 eFax WaldenL@TechSoftInc.com http://www.TechSoftInc.com Quiquid latine dictum sit altum viditur. (Whatever is said in Latin seems profound.) -----Original Message----- From: Klein, Ron [mailto:ron.klein@acs-inc.com] Sent: Wednesday, September 11, 2002 09:10 To: ''MIDRANGE-L' Subject: How do I end a job that is ending? Hi All, We have a job on our system that has a status of END. It is an interactive job that got disconnected when a dial in line dropped. This job has been running on the box since Sunday evening and just keeps chewing up CPU. Right now WRKACTJOB shows about 40%. We have been trying to end it but to no avail. Fortunately the joblog was set to wrap so it isn't filling up the disk with joblogs. Also does anyone know what the + means next to the job in WRACTJOB? Any suggestions would be appreciated. TIA Ron _______________________________________________ This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@midrange.com To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/cgi-bin/listinfo/midrange-l or email: MIDRANGE-L-request@midrange.com Before posting, please take a moment to review the archives at http://archive.midrange.com/midrange-l. _______________________________________________ This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list To post a message email: MIDRANGE-L@midrange.com To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/cgi-bin/listinfo/midrange-l or email: MIDRANGE-L-request@midrange.com Before posting, please take a moment to review the archives at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2025 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.