Take a look at:

http://www.taatool.com/document/L_upsmon.htm

Al

Al Barsa, Jr.
Barsa Consulting Group, LLC

400>390

"i" comes before "p", "x" and "z"
e gads

Our system's had more names than Elizabeth Taylor!

914-251-1234
914-251-9406 fax

http://www.barsaconsulting.com
http://www.taatool.com
http://www.as400connection.com



                                                                           
             Jerry Draper                                                  
             <midrangel@trilos                                             
             oft.com>                                                   To 
             Sent by:                  midrange-l@xxxxxxxxxxxx             
             midrange-l-bounce                                          cc 
             s@xxxxxxxxxxxx                                                
                                                                   Subject 
                                       UPS monitor to run in QCTL or ?     
             07/21/2005 08:26                                              
             PM                                                            
                                                                           
                                                                           
             Please respond to                                             
             Midrange Systems                                              
                 Technical                                                 
                Discussion                                                 
             <midrange-l@midra                                             
                 nge.com>                                                  
                                                                           
                                                                           




I have modified a CL pgm I got from IBM Boulder that monitors the message
queue
defined in the qupsmsgq system value for CPF1816 (power lost) and/or
CPF1817
(power restored).

We do this so that when our system goes on UPS power we can do a controlled
shutdown depending on how long we think our batteries will last.

This pgm is designed to run as a NEP (Never Ending Pgm) and the question is
what
is the best subsystem to run it in.  It will start out of QSTRUP.  Our
choices
are QCTL or our own homegrown sbs NEPPER which is where we run our system
wide
NEPs.

TIA,


Jerry

--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.




As an Amazon Associate we earn from qualifying purchases.

This thread ...

Replies:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.