|
We did on an e170 that we used for testing a Client Abscess replacement. It was so slow coming up that I had it scheduled to IPL at 5am and shutdown around 8pm. I'd get in at 6-7 and have to wait 1/2hr for it to come up if I didn't and we had night owl's that didn't come in to around 10-12 and would stay lateand they could remember to do a power-down. It worked great. Even had it come up on Sat. in case someone go the itch to come in and work. I think then it when down around 1-2pm. This was all thru IBM's power schedule commands. Since then that company has dissolved and I have the e170 in my basement, but can't check this out as I got a wild hair and put v5r2 on and didn't have any Lic Codes and my 70 days has expired and I've not gone back to reload my working save sys which was v4r1. Found out after I got the system and up'd the memory from 64mb to 512mb, that our IPL time went down to a about 5 mins! Jim Lowary System Analyst, Salton Inc. (573) 447-5500 On 8/30/06, rob@xxxxxxxxx <rob@xxxxxxxxx> wrote:
Is there anyone out there trying to run a "green" operation that uses
the
power schedule to power down at end of day and power it up the next morning? Or, if not the power schedule, some other method of achieving same? Rob Berendt -- Group Dekko Services, LLC Dept 01.073 PO Box 2000 Dock 108 6928N 400E Kendallville, IN 46755 http://www.dekko.com
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.