We did on an e170 that we used for testing a Client Abscess replacement. 
It was so slow coming up that I had it scheduled to IPL at 5am and 
shutdown around 8pm.  I'd get in at 6-7 and have to wait 1/2hr for it to 
come up if I didn't and we had night owl's that didn't come in to around 
10-12 and would stay lateand they could remember to do a power-down.  It 
worked great.  Even had it come up on Sat. in case someone go the itch to 
come in and work.  I think then it when down around 1-2pm.  This was all 
thru IBM's power schedule commands.

Since then that company has dissolved and I have the e170 in my basement, 
but can't check this out as I got a wild hair and put v5r2 on and didn't 
have any Lic Codes and my 70 days has expired and I've not gone back to 
reload my working save sys which was v4r1.  Found out after I got the 
system and up'd the memory from 64mb to 512mb,  that our IPL time went 
down to a about 5 mins! 

Jim Lowary
System Analyst, Salton Inc.
(573) 447-5500

On 8/30/06, rob@xxxxxxxxx <rob@xxxxxxxxx> wrote:

Is there anyone out there trying to run a "green" operation that uses 
the
power schedule to power down at end of day and power it up the next
morning?  Or, if not the power schedule, some other method of achieving
same?

Rob Berendt
--
Group Dekko Services, LLC
Dept 01.073
PO Box 2000
Dock 108
6928N 400E
Kendallville, IN 46755
http://www.dekko.com

As an Amazon Associate we earn from qualifying purchases.

This thread ...


Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.