I go into WRKUSRJOB F10 SBS QSYSWRK then scroll to very bottom and kill all
the Q1 jobs. They get restarted the next time we have a GO POWER restart.
I think Windows SAVE options are GREAT. The problem is in the RESTORE.
On multiple occasions I have given up on trying to recover some Windows
based application from the alleged backup ... I have to reinstall the
******* application, by which time it is at a new version, which means
incompatibility with the format of the backup ... what's needed at that
point is a recovery process that recognizes both that there are version
upgrades and that there is a need for backup restore that works.
I have on occasion needed to do a RESTORE/400.
It is a pain in the neck only because I only have to do it every few years.
In other words, every time I have to do a restore from backup, it is
several years since the last time I did it. Stuff falls out of my brain
with respect to particulars of doing it right. I need a backup restore
from my brain from the last time I did a basckup restore/400.
We're currently reviewing our backup strategy.
What I would be interested to hear is how other shops handle the QUSRSYS
library.
- Do you back it up as part of your nightly saves?
- If not, how often do you back it up?
- How do you back it up?
(e.g. SAVE21 only, SWA, or shutting down everything holding locks
within it, then SAVLIB)?
Somewhat related: Job Q1PSCH (PM/400 scheduler) is holding a lock
within QUSRSYS. Is there an easy way to stop/start this job for backup
purposes?
Thanks,
Moe
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact
[javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.