Paul,

First, do a APYPTF *ALL *PERM *IMMDLY like now, so you don't do this
anytime near the upgrade.

Second, why are you compressing job tables? Change that value to
*NONE on the ChGIPLA screen now. You might want to set your QTOTJOB and
QACTJOB to values close to number of jobs in WRKSYSSTS and WRKACTJOB
respectively. Then Compress the job tables in a prior IPL to reduce that
number.

You can apply the Cumulative, individual PTFs, and any other group
you want together just change from a 1 to a 2 on the GO PTF option 8 screen.

Do you have the latest version of the I_BASE cd for V5R4M5?

Now there is a quicker way, and that is to create your own install
images with the PTF's already applied using GO LICPGM option 40. But you
need to examine that, and is more than I want to write in length about.

Pete

Pete Massiello
iTech Solutions
http://www.itechsol.com



-----Original Message-----
From: midrange-l-bounces@xxxxxxxxxxxx
[mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of PaulMmn
Sent: Monday, June 08, 2009 10:38 PM
To: Midrange Systems Technical Discussion
Subject: v5r4m0 to v5r4m5 upgrade speed

We upgraded one of our two systems from v5r4m0 to
v5r4m5 this weekend. All went well. The only
complaint is that it took longer than I'd hoped!
(:

We need to upgrade our 2nd machine in a month or
so. I'm looking for ideas that can speed up the
process.

We ran the "pre-upgrade verification tool for IBM
i." These fixes need to be performed prior to
the Big Weekend!

All CDs and PTFs are pre-loaded in Image Catalogs.


THE PROCESS FROM THE TEST MACHINE

Kick all the users off and go to Restricted State

*1 SAVLIB QGPL
*2 SAVLIB QUSRSYS Supposedly 'our' stuff isn't touched, butŠ

*3 RCLSTG *DBXREF Was only required for the test system
Only took about 10 minutes!

*4 Apply PTFs *PERM One extra IPL here!

Change System Values for QUSRLIBL and QSYSLIBL &c

Manually install Licensed Internal Code took about 1/2 hour

Install OS/400 took about 10 minutes

*5 Sign on to system Sat on C900-2A95 for over an hour!
C900 2A95
[After] Abnormal [Termination] Work Control Block
Table cleanup
We have
19 job tables on our test machine, 15 on
production
Apply new PTFs (cume) Only for 5722999
and 5722SS1 - the instructions say so!

Apparently, after a 'fresh' install, the system
wakes up on the "A" side; the PTFs apply to the
"B" side immediately. This means you can't load
the Group PTFs as well and apply them in a single
IPL...

IPL to the "B" side

Apply Group PTFs Only for 5722999 and 5722SS1!

IPL to the "B" side

Apply v5r4m5 'stray' PTFs
The ones that replace v5r4m0 PTFs

Change system values back to 'our' values

*6 IPL to the "B" side This
starts everything up with our controlling
subsystem and our library lists


We still need to apply the full cume and full
Group PTFs to the system, and verify that we have
a full set of the v5r4m5 'stray' PTFs


TIME SAVERS

*1
*2
*3
*4 These 4 items are 'no brainer' do-ahead-of-time items.

*3 We have some duplicate items on our
production machine to deal with ahead of time.

*5 C900 2A95 [After] Abnormal [Termination]
Work Control Block Table cleanup. We have 19 job
tables on our test machine, 15 on production

We can compress the job tables, but I think it's
more an issue of cleaning up all those left-over
spooled files so the jobs go away and there's not
so much to clean up. If we minimize the jobs on
the system I think things may go faster.

I know we could tell the system to 'detach' the
spooled files, but that means finding them will
be a lot harder. We currently have 84000 jobs on
our production machine. Many of these are job
logs. We only have 34000 jobs on our test
machine.

We do purge job logs, but keep a rolling week on
line for the programmersŠ We WILL purge a lot
more before the Big Day!

*6 We should be able to stack the Group and
v5r4m5 PTFs in a single apply-- saving another
IPL.

THOUGHTS

I think the process on The Big Day can be shrunk
by at least 2 IPLs, and the long delay for the
[After] Abnormal [Termination] Work Control Block
Table cleanup can be reduced by removing a lot of
jobs from the system. These items alone may save
close to 3 hoursŠ

My thoughts now are to re-apply the Cume and the
Group and the v5r4m5 PTFs to the machine we just
upgraded to pick up any 'strays' we missed.

I also want to apply the Cume and the Group PTFs
to the 2nd (production) machine ahead of time,
even though we will need to re-apply the Cume and
the Group for 5722999 and 5722SS1 after the
upgrade. This will eliminate the need for an
after-upgrade round of PTFs (except the v5r4m5
batch).


YOUR THOUGHTS

If anyone has any ideas of things that will make
the process go faster the next time around,
please let me know!




Paul E Musselman
IT Technical Support
General Cable Corporation
(859) 572-8030
(859) 572-8477 (fax)
PMusselman@xxxxxxxxxxxxxxxx

As an Amazon Associate we earn from qualifying purchases.

This thread ...

Follow-Ups:
Replies:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.