|
Here is what DSPLOGBRM shows:TAPMLB04.
Date sent Time sent Message
5/18/10 3:08:13 Starting save of list SAVELIST to devices
5/18/10 3:08:15 Change to media controls successful.TAPMLB04.
5/18/10 3:08:16 Change to media controls successful.
5/18/10 3:08:16 Starting save of library VNGDBDTA to devices
5/18/10 3:08:16 Starting save of library VNGCUSDTA to devicesTAPMLB04.
5/18/10 3:08:16 Starting save of library PROD_MOD to devicesTAPMLB04.
5/18/10 3:08:16 Starting save of library PROD_DTA to devicesTAPMLB04.
5/18/10 4:39:26 6398 objects saved from library VNGDBDTA.libraries
5/18/10 4:39:26 35 objects saved from library VNGCUSDTA.
5/18/10 4:39:26 2266 objects saved from library PROD_MOD.
5/18/10 4:39:26 117 objects saved from library PROD_DTA.
5/18/10 4:39:26 4 libraries saved.
5/18/10 4:40:00 Change to media controls successful.
5/18/10 4:40:00 Change to media controls successful.
5/18/10 4:45:57 68 objects saved from library QGPL.
5/18/10 4:45:58 Save of list SAVELIST complete.
As you can see, all the library saves reported the same start and stop
times. A question: are these times the same because these four
(excluding QGPL) are in the same step? The control group step inquestion
is:moving
30 SAVELIST *OBJ *SYSBAS
...with SAVELIST defined as:
10 VNGDBDTA *ALL *ALL *ALL
20 VNGCUSDTA *ALL *ALL *ALL
30 PROD_MOD *ALL *ALL *ALL
40 PROD_DTA *ALL *ALL *ALL
50 QGPL *ALL *JRNRCV *ALL
Do I need separate steps to accurately track the save times?
We are on a 9406-810. The spend here is tight, and there is talk to
to a big-name TLA (not IBM). Upgrading the tape library will probablynot
happen.wrote:
Thanks,
Loyd
On Tue, May 18, 2010 at 10:54 AM, Kirk Goins <kirkgoins@xxxxxxxxx>
posted
What is showing in the History Log. Typically there is a message
runningthere for each library saved. I don't know what system you are
butup
stepping up to a LTO2-4 using the LVD interface should speed things
too.save a
wrote:
On Tue, May 18, 2010 at 6:28 AM, Loyd Goodbar <loyd@xxxxxxxxxxxxxx>
In BRMS, is there a way to determine the actual time it took to
tolibrary?
In our daily backup, we perform a full save of four main libraries
later.tape.
They all start within a couple of minutes, and end 90 minutes
Herewe
afteris
a partial list of the media information report (entries before and
these five are excluded):
Saved Save Item Save Save Expire Objects
Item Type Type Date Time Date Saved
VNGDBDTA *FULL *LIB 5/18/10 3:08:17 6/08/10 6398
VNGCUSDTA *FULL *LIB 5/18/10 3:10:23 6/08/10 35
PROD_MOD *FULL *LIB 5/18/10 3:10:24 6/08/10 2266
PROD_DTA *FULL *LIB 5/18/10 3:11:15 6/08/10 117
QGPL *FULL *LIST 5/18/10 4:40:02 6/08/10 68
The tape drive is single LTO1 (3581). We are V5R4. (Unfortunately,
6.1.)have
vendor software issues - sitll! - that prevent us from moving to
then
Our current save strategy is to save the enitre system on Sunday,
mailingsave--
specific libraries (full save) during the week. In the event of adisaster,
we only need a Sunday tape and the most recent daily tape. Otherlibraries
not saved daily were determined to be of low risk.
We are looking to reduce our current backup window.
This is the Midrange Systems Technical Discussion (MIDRANGE-L)
list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.