First, have you saved your host LPAR on to tape(s)?? If you have and you
can import your sysplan I would image you could 01D ipl off that saved
tape, eventually you would have all the slave NWS/NWSSTG's and you would be
good to go??

On Mon, Apr 23, 2012 at 8:32 AM, Jim Oberholtzer <
midrangel@xxxxxxxxxxxxxxxxx> wrote:

Excellent, I love finding partners that actually know about the proper
code to add to orders!

I hear the fat finger argument, my fingers are at least a two keys
bigger than the ones I generally want to hit....

Jim Oberholtzer
Chief Technical Architect
Agile Technology Architects


On 4/22/2012 6:46 PM, Kirk Goins wrote:
Thanks Jim,
The BP ( me and my very good sales rep ) did specify the feature codes,
sysplan and rack layout to have the system built correctly andx double
checked on the order. IBM did at least build the HW in the rack
correctly...

Host plus 5 guest really isn't too bad. Just some need to make the 2
system
as close as I can want ed to keep the fat fingering to a minimum:)


On Sat, Apr 21, 2012 at 11:55 AM, Jim Oberholtzer<
midrangel@xxxxxxxxxxxxxxxxx> wrote:

In order to get IBM to follow the system plan they are furnished, the
order has to have the correct feature codes on it. Since very few
partners even know they can do that it is doubtful that feature code
was
on the order. Furthermore the system has to be a brand new system,
not
an MES upgrade (even if the hardware is completely replaced), so I'm
not
surprised the hardware layout was not to your specifications.

Since the LPAR configuration is really stored on the FSP, your best
bet
is to export the system plan and then import it, but 6 LPARs does not
seem like that many to create manually. Two hours should do it and
I'll
be faster in the long run by the time you get done setting up all the
virtualization anyway.

Jim Oberholtzer
Chief Technical Architect
Agile Technology Architects


On 4/20/12 1:16 PM, Kirk Goins wrote:

> Normally I work on systems with just a few ( 2 or 3 ) LPARs and
it's
pretty
> fast just to create the LPARs by hand. I know I could upload a
sysplan
but
> have never had the time to play with that.
>
> So we just put together a 6 LPAR box ( 1 IBM i Host and 5 IBM i
Guests ).
> Now I get to do its twin next week. Assuming IBM didn't follow
the SPT on
> the 2nd system like they didn't on the first... I was wondering
if there
is
> a way save the LPAR config data and restore it to the 2nd HMC
and then
jsut
> make some tweaks? Can I export the say a SYSPLAN from the HMC
and import
> it into SPT?
>
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L)
mailing list
To post a message email:MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit:http://lists.midrange.com/mailman/listinfo/midrange-l
or email:MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
athttp://archive.midrange.com/midrange-l.


--
--
This is the Midrange Systems Technical Discussion (MIDRANGE-L) mailing list
To post a message email: MIDRANGE-L@xxxxxxxxxxxx
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/midrange-l
or email: MIDRANGE-L-request@xxxxxxxxxxxx
Before posting, please take a moment to review the archives
at http://archive.midrange.com/midrange-l.



As an Amazon Associate we earn from qualifying purchases.

This thread ...

Follow-Ups:
Replies:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.