Active jobs:   1222, even with 10 batch jobs running at one, 2nd core never used.
Spikes are hitting .8, never goes over 1.0
-----Original Message-----
From: midrange-l-bounces@xxxxxxxxxxxx [mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of rob@xxxxxxxxx
Sent: Wednesday, May 15, 2013 11:22 AM
To: Midrange Systems Technical Discussion
Subject: RE: Cumulative PTF w/o Technology Refresh
You ought to try running more than one job at a time.  The fact that one or more is single threaded doesn't matter.  One could be running on one core and the second on the other.
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept 1600 Mail to:  2505 Dekko Drive
          Garrett, IN 46738
Ship to:  Dock 108
          6928N 400E
          Kendallville, IN 46755
http://www.dekko.com
From:   "Steinmetz, Paul" <PSteinmetz@xxxxxxxxxx>
To:     "'Midrange Systems Technical Discussion'" 
<midrange-l@xxxxxxxxxxxx>, 
Date:   05/15/2013 11:17 AM
Subject:        RE: Cumulative PTF w/o Technology Refresh
Sent by:        midrange-l-bounces@xxxxxxxxxxxx
I have 2 cores on my production LPAR, 2nd core is never used, majority of 
AS/400 software is single threaded, biggest  reason why the core is not 
used.
Confirmed this with MPG performance processor used graph.
-----Original Message-----
From: midrange-l-bounces@xxxxxxxxxxxx [
mailto:midrange-l-bounces@xxxxxxxxxxxx] On Behalf Of rob@xxxxxxxxx
Sent: Wednesday, May 15, 2013 11:08 AM
To: Midrange Systems Technical Discussion
Subject: Re: Cumulative PTF w/o Technology Refresh
Jim hit the biggest one
Was the LPAR profile changed to use the extra processor?
I can go to my HMC and activate another core by entering the key in our 
Capacity Upgrade on Demand.  However, if I don't then allocate that to one 
or more lpars it's a waste of money.
Jim, I too initially thought he didn't want to apply the TR.  I reread it. 
 He does want to apply the TR.  He was just under the impression that it 
wasn't included on the cume.  It is, IBM's just behind on their 
documentation.  I've submitted web feed back that they get the cover 
letter for TR6 updated to show the PTF's are now on a cume.
Rob Berendt
--
IBM Certified System Administrator - IBM i 6.1 Group Dekko Dept 1600 Mail 
to:  2505 Dekko Drive
          Garrett, IN 46738
Ship to:  Dock 108
          6928N 400E
          Kendallville, IN 46755
http://www.dekko.com
From:   Jim Oberholtzer <midrangel@xxxxxxxxxxxxxxxxx>
To:     Midrange Systems Technical Discussion <midrange-l@xxxxxxxxxxxx>, 
Date:   05/15/2013 11:02 AM
Subject:        Re: Cumulative PTF w/o Technology Refresh
Sent by:        midrange-l-bounces@xxxxxxxxxxxx
Kurt,
I agree with your partners request, I would make the same one.  That 
said, if you have seen no improvement, I suspect a different problem 
than PTFs.  Is this an LPAR box?  Was the LPAR profile changed to use 
the extra processor?  Is there a high limit on the processor that is 
less than (I think two based on your description) the number of 
processors you had before adding one?
Yes, you can apply the cumulative and then go back and apply the group 
for the TR later; But I highly suggest that in addition to the 
Cumulative you apply the following list of groups as well:
PTF Group             Text
SF99710               CUMULATIVE PTF PACKAGE C3037710
SF99709               GROUP HIPER
SF99708               GROUP SECURITY
SF99705               HARDWARE AND RELATED PTFS
SF99701               DB2 FOR IBM I
SF99627               7.1 ELECTRONIC SERVICES GROUP PTF
SF99572               JAVA
SF99368               IBM HTTP SERVER FOR I
SF99367               TCP/IP PTF
SF99366               PRINT PTFS
SF99362               BACKUP RECOVERY SOLUTIONS  (even if you don't use 
BRMS this is where all the save/restore PTFs are)
SF99145               PERFORMANCE TOOLS  (if you have them)
The TR is SF99707 TECHNOLOGY REFRESH
The HIPER, and Hardware ones are the ones I would find most important in 
this case, however if your taking the time to apply any Group you might 
just as well get the entire batch.    I'm not sure why you would not 
want the TR group as well, unless there is something in the cover letter 
that leads you to believe there is going to be a problem.
Jim Oberholtzer
Chief Technical Architect
Agile Technology Architects
On 5/15/2013 9:49 AM, Anderson, Kurt wrote:
So we've been really bad about PTFs.  Our IBM BP is asking that we apply 
PTFs because after getting an additional core activated (from 1 to 2) 
we've noticed 0 improvement on the system.
So we finally ordered a cumulative PTF and we're looking at applying it. 
  But then I thought, "What about technology refreshes?"  It doesn't 
appear that the cume comes with a TR on it.  Cume: C3037710
http://www-912.ibm.com/systems/electronic/support/s_dir/sline003.nsf/PSP%20Number%20View/SF98035
Are we safe to apply the Cume w/o a TR and then later investigate 
applying a Technology Refresh?
Thanks,
Kurt Anderson
Sr. Programmer/Analyst
CustomCall Data Systems, a division of Enghouse Systems Ltd
-- 
As an Amazon Associate we earn from qualifying purchases.