One of my customers uses PowerHA for most of the environment, but
iCluster (HA Assist) for the *SYSBAS objects. iCluster will replicate
anything in *SYSBAS with some interesting exceptions ; directory
entries, job schedule entries, and a couple of others I don't remember
off hand.
They use Aldon (another Rocket Software Product) and the administrative
domain just would not handle the Aldon requirements, hence the iCluster.
So in short the answer is yet, albeit with a different product.
Altera and iCluster will not play together well in the same sandbox, so
you'll have to pick that one. Setting up iCluster is fast enough that I
would can the Altera, set up iCluster to run in it's place and migrate
everything into the iASP as you can.
Word of advice, I have found that creating the PowerHA mirroring before
you populate the iASP is the easiest way to get things going, if you
have the disk space.
Jim Oberholtzer
Chief Technical Architect
Agile Technology Architects
On 5/21/2013 8:35 AM, Mitchell, Dana wrote:
I'm beginning to work on a proposal to migrate our DR solution from iTERA to PowerHA. We are thinking during the implementation phase, we can have both running at the same time. Then remove a library from iTERA syncing/journaling, backup and restore it to the IASP.
Has anyone else done something similar? Are there any pitfalls in running both products at once? I am also wondering about replicating objects not supported in an IASP, any problems migrating iTERA to HA Assist?
Thanks
Dana
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2024 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact
[javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.