The next TR may (or may not) be released for several weeks. That really
has no bearing on the preparation PTF's for these next TR's.
http://www-912.ibm.com/a_dir/as4ptf.nsf/a18db68aae4a7d81862566ba005d145c/7e02c1cdc435b4e986257ece0058139c?OpenDocument
http://www.ibm.com/support/docview.wss?uid=nas3308acf9e44d1067c86257ece00581386
There are no MF99* ptf's listed on any "group" ptf at:
http://www-912.ibm.com/s_dir/sline003.nsf/GroupPTFs?OpenView&view=GroupPTFs
MF99102 for TR2 prepare was on the cume current as of 2015-10-01: C5135720
as per
http://www-912.ibm.com/s_dir/sline003.nsf/2d3aff1c6b4d6ce086256453000d971e/234a077bc2a3103786257b55004fc1d8?OpenDocument
But MF99103 for TR3 prepare was not.
There is this line to consider...
- The next cumulative package is scheduled for 04 Dec 2015.
MF99010 for TR11 prepare was on the old 7.1 cume. The cover letter for
that cume states:
- The next cumulative package is scheduled for 03 Dec 2015.
Based on that, if have an IPL coming sometime between now and then anyway
you may wish to download the "prepare" ptf now and get that permanently
applied before then.
Rob Berendt
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2025 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact
[javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.