Larry,

I am looking at the steps at
https://www.ibm.com/support/knowledgecenter/ssw_ibm_i_73/rzaly/rzalyloadsource2.htm

My concern with this is it assumes that I want to replace all the disks in
the existing two 5887's.
How do I adapt this technique to flag a drive in the new expansion units
as the new load source?
I see that task 9 does the copy load source.
I do not plan on doing tasks 11-13.
How do I change the system to point to the location of the new load source
disk after completing task 9?
And then after that I'll go back to task 8 and remove the old load source
unit.

And after everything checks out then I'll go back to adding the old SSD's
to a new secondary ASP. That may be after a little breather. Not time
critical. And I do not believe creating this secondary ASP will involve
DST (only SST). So it should be non disruptive.


Rob Berendt

This thread ...

Follow-Ups:
Replies:

Follow On AppleNews
Return to Archive home page | Return to MIDRANGE.COM home page

This mailing list archive is Copyright 1997-2026 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].

Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.