|
Lim -
I agree with Eric - you should probably change the backup program to use
ENDJOB OPTION(*CNTRLD) with DELAY(xx), followed by a DLYJOB(xx) with a
long
enough interval to allow the never-ending program to cycle through its
logic.
At either the top or the bottom of the processing logic in the program
check
%SHTDN or use the SHTDN opcode to check for whether the subsystem, system,
or endjob was requested, then perform and orderly shutdown of the
program...
- sjl
Lim wrote:
This job is a never ending job and it is running on a subsystem that get
ends (ENDSBS), with option(*immed), during system backup.
My guess is that it was in the process of connecting to a mysql server
and
the server ip is wrong or sever was downed at that time. hhhmm.
This mailing list archive is Copyright 1997-2026 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact [javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.