Three ideas-
1) Use the job scheduler to run a master cl at 3:00 am. This cl then has x number of sbmjobs with the desired scdtime.
2) At the end of the cl, calculate the next runtime and have the job do a sbmjob with the calculated time.
3) Leave the job running all day and use the dlyjob(900) and a goto to loop until the desired stop time.
I have used all of these methods and they all work equally well - however, one may be better suited for the task than another.
HTH,
Joe
"Bonnie Lokenvitz" <BLokenvitz@xxxxxxxxxx> 07/19/07 2:31 PM >>>
I have a batch job that needs to be submitted and run every 15 minutes
from 3:00 AM to midnight. The machine does not have ROBOT installed.
Would you give me some ideas on how to approach this?
Thank you,
Bonnie Lokenvitz
This mailing list archive is Copyright 1997-2026 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact
[javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.