I don't want to mess with my current production system, which is a Power5 V5R4 installation.
I just want to schedule time for a Option 21 save of the V5R4 system and then return it to production operation ASAP.
While my users go on using the current system, I will be installing new Power6 hardware, with V6R1 installed on it.
I'll test it all out to make sure everything works and then over Labor Day weekend I'll refresh the application data libraries and go Live on the new system.
I want to find an IBM check list that details out all the steps I need to do in order to restore (migrate) the V5R4 system to the new V6R1 system using V5R4 BU tapes. maybe this would be considered a Side-by-Side migration (????)
If you know where I can find this information I'd be eternally grateful !!!!!
P
Please consider the environment before printing this email
Kenneth
Kenneth E. Graap
Systems Administrator
NW Natural
keg@xxxxxxxxxxxxx<mailto:keg@xxxxxxxxxxxxx>
http://www.linkedin.com/in/kennethgraap
503-226-4211 x5537
As an Amazon Associate we earn from qualifying purchases.
This mailing list archive is Copyright 1997-2025 by midrange.com and David Gibbs as a compilation work. Use of the archive is restricted to research of a business or technical nature. Any other uses are prohibited. Full details are available on our policy page. If you have questions about this, please contact
[javascript protected email address].
Operating expenses for this site are earned using the Amazon Associate program and Google Adsense.